TECHNICAL DATA
Maximum application time: approx. 6-8 hours.
Open-drying time: approx. 20 minutes.
Correctability: approximately 30 minutes.
Grouting:
- walls: after 3-6 hours;
- floors: after 24 hours.
Foot traffic load: after 24 hours.
Full load: after 14 days.
Colours: grey.
Application: Trowel No. 4, 5 or 6.
Storage: 12 months.
Consumption: 2-5 kg/m².
Packaging: 25 kg bags.