The shuttering blocks should be laid in three to four layers, joining them behind-right or secured against displacement, and then filled with concrete and compacted.
In the case of reinforced concrete walls, appropriate reinforcement must be placed during the placement of successive layers of blocks.
When the wall is to be higher than 1 m (four layers), after the initial filling of the first part has set, it is possible to proceed to the laying of subsequent layers.
Product features:
- Stable dimensions
- Profiled edges for easy jointing
- Notches allowing horizontal and vertical reinforcement to be used
- High fire resistance